Amber Industrial Zone – Northwest of Ho Xa
Amber Industrial Zone – Northwest Ho Xa is located on an area of 214.77 hectares in Vinh Linh district, Quang Tri province. Its prime location is directly on National Highway 1A, close to several seaports and major airports. The area boasts abundant skilled labor that is professionally trained, ready to support future economic development in the province.
Mục lục
Basic Information
Amber Industrial Zone – Northwest Ho Xa
Investor: Financial Investment and Real Estate, Energy Development Group
Address: Vinh Linh district, Quang Tri province
Operation period: 50 years (2021 – 2071)
Total area: 214.77 hectares
Occupancy rate: 80%
Building density: 70%
Price: 29 USD/m2/lease cycle
Geographical Location
Connectivity and Location:
Located at the strategic intersection of National Highway 1A and National Highway 9D, Amber Northwest Hồ Xá Industrial Park is a central transportation hub in Quảng Trị province. With proximity to several seaports, airports, and railway stations, this area offers convenient and efficient international connections. Additionally, the region benefits from abundant natural resources such as forests, minerals, and aquatic products, pepper, rubber..
Distances:
– Quảng Trị Airport: 30 km (Expected construction 2022-2024)
– Phú Bài Airport (Huế International Airport): 125 km
– Đồng Hới Airport (Quảng Bình): 71 km
– Cửa Việt Port: 35 km
– Chân Mây Port: 170 km
– Mỹ Thủy Port: 60 km (Phase 1: 2021-2025)
– Sa Lung Railway Station: 500 m
Infrastructure and Utilities
Technical Infrastructure | |
Internal traffic: | Main axis 30 – 45m Branch axis 13.5 – 19.5m |
Electricity | Voltage 22kV supplied at the factory gate, connected from 100/22kV – 40MVA transformer station |
Wastewater treatment | Treatment plant capacity in area A: 4,000 m³/day, area B: 2,400 m³/day |
Water source | Area A – 4,600 m³/day Area B – 4,000 m³/day |
Drainage system | Concrete pipe system with diameter D600 – B2,000 x 2,000, ensuring rapid drainage capacity |
Waste storage | Hazardous industrial solid waste is collected into professional waste storage facilities, meeting environmental protection standards |
Technical infrastructure | Social infrastructure |
Security: 24/7 for the residential project for specialists and workers | Two residential projects for specialists and workers |
Firefighting: 24/7 | Distance to medical center: 5 km |
Telecommunications system: International standard | Distance to local market: 1 km |
Hệ thống kho vận | Distance to Dong Ha city: 20 minutes drive |
One-stop service | |
Information support, business environment consulting | |
Investment promotion seminars | |
Other service facilities: gas station, bank, etc. |
Attracting Industries
– Metal production, jewelry, imitation jewelry
– Handicraft production
– Wood processing & manufacturing products from wood, bamboo, rattan
– Textiles, leather shoes
– Mechanical assembly
– Food processing
– Warehousing
Investment Incentives
Corporate income tax incentives
Value Added Tax (VAT) Incentive
VAT exemption for imported goods used as raw materials for production, processing goods for export under signed processing contracts with foreign countries.
Import Tax Incentives
– Exemption from import duties on goods imported to create fixed assets
– Exemption from import duties on imported raw materials and supplies used for manufacturing goods for export.
– Special preferential import-export tariffs of Vietnam under the EVFTA decree.
Other Incentives from the Province
– Support for product introduction.
– Support in providing information and advisory on investment and business procedures.
– Support in investment promotion, trade, and tourism.
– Support for 1- time training costs for employees recruited within the province.
Potential for Development in Quang Tri Province
Economic Growth and Resource Mobilization:
– The GRDP (Gross Regional Domestic Product) of the industrial and construction sectors in 2021 increased by 14.75%, the highest growth rate in the past 10 years.
– In 2021, the total investment capital implemented in the province reached 28,677 billion VND, an increase of 50.67% compared to 2020.
The infrastructure system is continuously upgraded and newly built
– Construction of National Highway 15D.
– Expansion project of National Highway 9 from National Highway 1 to Cua Viet Port.
– Coastal road project connecting the East-West Economic Corridor Phase 1.
– Project to connect the Eastern and Western branches of Ho Chi Minh Road.
– Dong Ha – Lao Bao railway project; My Thuy port connected to the North-South railway.
Key Projects:
– Quang Tri Airport project preparing for construction and investment from 2021 to 2024.
– LNG Hai Lang power center with a capacity of 1,500 MW in Phase 1.
Customers and businesses interested in investing are encouraged to contact the hotline at 0967413186 or fill out the form below to receive more detailed information.