Kovipark owns a favorable geographical position, 30km from the center of Thanh Hoa city, with the advantage of being a multi-industry industrial park Kovipark is considered as one of the potential industrial parks as an opportunity and an attractive investment point. success of domestic and international contractors.

Geographical location:

  • The project is located at: Bim Son town, Thanh Hoa province, Vietnam:
  • Near 1A National Highway in Bim Son town, Thanh Hoa province
  • 120km south of Hanoi
  • 120km northeast of Hai Phong seaport
  • 75km southeast of Nghi Son seaport, Thanh Hoa
  • 40km from Tho Xuan airport, Thanh Hoa province, 140km from Noi Bai International Airport. The main road of the industrial park will be connected to the North-South expressway, the distance is 1.5km .
  • Adjacent to North-South railway station: 5Km

Industry attracting investment:

  • Textiles, leather shoes
  • Manufacturing and assembling cars
  • Mechanical engineering
  • Producing high-grade building materials
  • Steel structure production
  • Electronic
  • High-tech products
  • Processing agricultural and forestry products for export

 

khu công nghiệp bỉm sơm A

Diagram of division of zones in Bim Son Industrial Park A

 

1. Infrastructure

Traffic road:

  • Main road of industrial park: 2×10.5m wide. Green space in the middle: 3m wide, trees and pedestrian walkway: 2x8m wide.
  • The internal roads are designed in a modern, synchronous manner, convenient for travel activities;
  • Branch road: 2×7.5m wide, trees and pedestrian walkway: 2×8m . wide
  • Lighting system is installed along the route.

Electricity:

  • Power is supplied stably and continuously from the 110KV high voltage line passing through Bim Son Industrial Park
  • The medium voltage power network is invested in a modern and synchronous manner, running along the internal road of the industrial zone to the factories.
  • Enterprises self-invest in building low-voltage power stations depending on the capacity demand.

Water system:

  • Water is supplied stably from the plant with a capacity of 16,000 m3/day.

Communications:

  • The telecommunications and communication systems meet international standards, ready to meet the needs of businesses and investors.
  • The underground fiber optic cable system is conveniently arranged and connected to each factory in the industrial park.

Wastewater treatment:

  • Rainwater and wastewater drainage systems are built separately. Rainwater is collected through a system of ditches and discharged to outlet outlets in the area.
  • All industrial wastewater is preliminarily treated by the enterprise to the prescribed standards before being discharged into the common wastewater system of the Industrial Park. After that, the industrial park will continue to treat water once before discharging it into the environment.

Some other services:

  • The industrial park is close to branches of some banks such as BIDV, Agribank, Techcombank, Sacombank, etc.
  • There are about 14 colleges and vocational schools.
  • Housing for workers: Residential areas for workers are planned near the industrial park.
  • The office of Thanh Hoa Customs is located in the Industrial Park, convenient for businesses to carry out procedures right here.

2. Investment incentives

Corporate income tax:

  • 20% tax discount for the first 15 years
  • Tax exemption for 2 years (from the first year of profit)
  • 50% reduction of corporate income tax for the next 4 years

Import Tax:

  • 0% for imported machinery and equipment to form fixed assets.

Export tax:

  • Exemption from export tax for raw materials for production on the list of special projects encouraging investment for 5 years from the date of production.