Đất Đỏ 1 Industrial Zone – Ba Ria Vung Tau Province

Đất Đỏ 1 Industrial Zone is developed as a multi-sector industrial park, focusing on attracting projects with high technology, low labor intensity, and minimal environmental impact. With its complete infrastructure and meticulous management, we are confident it will be an excellent location for your manufacturing operations in Vietnam.

Khu cong nghiep Dat do 1 1
Khu cong nghiep Dat do 1 2
Khu cong nghiep Dat do 1 3
Vi tri khu cong nghiep Dat do 1

Basic Information:

– Industrial Zone: Đất Đỏ 1 Industrial Zone
– Investor: Tín Nghĩa – Phương Đông Industrial Park Corporation
– Address: Phuoc Long Tho Commune, Dat Do District, Ba Ria Vung Tau Province
– Total Area: 496.22 hectares
– Land Lease Term: Until August 2059
– Occupancy Rate: 61%
– Building Density: 60%
– Price: 70 USD/m2 (excluding VAT)

Geographical Location

Đất Đỏ Industrial Zone benefits from a strategically advantageous location and strong regional connectivity:
– Located just 12km from Bà Rịa City.
– Approximately 30km from Vũng Tàu City.
– Close to Cái Mép Port (30km) and Phú Mỹ Port (35km), facilitating convenient international cargo transportation.
– 50km from Long Thành Airport and 85km from Tân Sơn Nhất Airport, ensuring connectivity to important international and domestic transportation hubs.

Vi tri dia ly khu cong nghiep dat do 1 ba ria vung tau

Master Plan Map

Ban do quy hoach khu cong nghiep dat do 1
Ban do quy hoach khu cong nghiep dat do 1 Ver 2

Infrastructure and Utilities

Electricity Supply System:

The industrial zone invests in constructing a 110/22kV substation to supply electricity to both the industrial zone and residential areas. The initial capacity of the substation is 6 MVA, with a long-term plan to expand to 6 +40MVA.
– Power Source: From the national electricity grid.
– Electricity Tariff for 22kV ( According to state regulations)

He thong dien ver 1 khu cong nghiep Dat do 1

Water Supply System

Currently, the industrial zone can supply water at a capacity of 22,000 m3/day. The water source is obtained from Đá Bàng Water Plant.

Additionally, the industrial zone can supply up to 100,000 m3/day of raw water as needed.

He thong cap nuoc khu cong nghiep dat do 1

Wastewater Treatment System

The total capacity of the wastewater treatment plant (WWTP) is 17,600 m3/day-night.
– Phase 01 of the WWTP: 2,000 m3/day-night.
– Phase 02 of the WWTP, currently under development: 6,000 m3/day-night.

He thong xu ly nuoc thai khu cong nghiep Dat do 1

Telecommunication System

There are 3 telecommunication stations located near Đất Đỏ 1 Industrial Zone, ensuring seamless connectivity for telecommunications services to tenants within the industrial zone.

Internal Road Network System

The main axis road within Đất Đỏ 1 Industrial Zone consists of 6 lanes, with widths ranging from 46m to 54m. Branch roads within the industrial zone have 2-4 lanes, with widths of 26m.

Attractive Industries

Đất Đỏ 1 Industrial Zone is developed to attract diverse industries, focusing on projects with high technology, low labor intensity, and minimal environmental impact. Special incentives are provided for investments in high technology, information technology, and support industries.

Rental Prices and Costs

– 100% exemption for the first 2 years.
– 50% reduction for the following 4 years.

– 100% tax exemption for the first 4 years.
– 50% reduction for the following 9 years.
– Applied tax rate of 10% for the first 15 years.

– Obtain investment certificate, business registration certificate, and company seal.
– Import-export procedures, customs clearance, customs declaration.
– Land leveling and construction services.
– Consultancy on green factory standards, renewable energy, carbon credits, etc.
– Logistics and transportation services for import and export goods.

Investment Procedure

WorkPerformer
Investors research and select the location; register land holding and sign the land lease agreement.Investors and VKI
Investors prepare necessary documents to apply for investment certificate (at the Management Board of Ba Ria – Vung Tau Industrial Parks) and register the establishment of the enterprise.Investors and Dat Do 1 Industrial Park
Sign the official land lease agreement, hand over the land (create handover minutes).Investors and Dat Do 1 Industrial Park
Prepare an Environmental Impact Assessment report (at the Management Board of Ba Ria – Vung Tau Industrial Parks).Investors and VKI
Review technical design documents for construction permit application (at the Management Board of Ba Ria – Vung Tau Industrial Parks), fire prevention and fighting (at the Fire Department).Investors and VKI
Constructing workshop (registering contractors with Đất Đỏ 1 Industrial Zone).Investors and VKI
Notification of commencement of operation (Management Boards of Ba Ria – Vung Tau Industrial Parks and Đất Đỏ 1 Industrial Zone).Investors and VKI

Customers and businesses interested in investing, please contact the hotline at 0967 41 31 86 or fill out the form below to receive more detailed information.