Dat Do Industrial Park – Vung Tau
Dat Do I Industrial Park is located in the master plan of 2,000 hectares of industrial land in Dat Do district, near the Political and Administrative Center of Ba Ria – Vung Tau province. convenient location in connecting infrastructure with neighboring areas and major economic centers in the Southeast region.
Overview
Dat Do 1 Industrial Park is planned to be built on an area of 496.22 ha, of which the industrial land area for lease is 377.22 ha, the area of warehouse land is 15.9 ha.
The industrial park is adjacent to National Highway 55 to Binh Thuan and Central provinces, connecting National Highway 51 to Dong Nai, City. Ho Chi Minh City is very convenient for transporting goods. In addition, the distance from Dat Do I Industrial Park to deep-sea ports such as Cai Mep Port, SP-PSA Port, Phu My Port is 30km, which will help investors save costs as well as transport time. materials when investing in projects in Dat Do I Industrial Park.
In addition, with the maximum support of Dat Do I Industrial Park for secondary investors in the procedures for applying for an investment certificate, supporting the preparation of an environmental impact assessment report, a construction permit, etc. , registration of business establishment, seal application… and the most competitive rental rates in the area of BRVT Province in particular and the southern key economic region in general, will contribute to making Dat Do I Industrial Park become the focal point of revenue. attract investment in the future.
The industrial park is built in the direction of multi-industry, focusing on attracting projects with high technology, using less labor, without causing environmental pollution, etc. Especially, investment incentives for high technology and information technology are prioritized. news, supporting industry.
Advantages of connecting to the external transportation system
Connecting neighboring areas:
- 25km from Vung Tau City.
- 12km . from Ba Ria City
- 40km from Dong Nai province.
- 80km from Bien Hoa City.
- 110km from Binh Duong province.
- 85km from Tan Son Nhat Airport.
- 50km from Long Thanh International Airport.
- 10 – 15km . from The Grand Strip Casino Resort, Ho Tram Golf Course
How the ports ship the goods:
- Cai Mep International Port (maximum vessel tonnage 200,000 tons): 30km.
- Phu My Port (maximum vessel tonnage of 60,000 tons): 35km.
- Go Dau Port (maximum vessel tonnage of 30,000 tons): 45km.
List of lots
Utilities
Mục lục
1. Geographical location
Dat Do 1 Industrial Park is a multi-industry industrial zone, in which priority is given to attracting high-tech industries, which are less harmful to the environment, and employ few workers such as electronics industry, supporting industries.
Regarding traffic connections and regional links, Dat Do Industrial Park has a convenient location:
- 12km from Ba Ria city
- 30km from Vung Tau city
- 30km from Cai Mep Port, 35km from Phu My Port
- 50km from Long Thanh Airport, 85km from Tan Son Nhat Airport
2. Infrastructure
The industrial park is synchronously invested and ready to meet the needs of secondary investors to deploy and build factories. Besides, Dat Do Industrial Park I has good geological foundation R >= 2.5kg/cm2, high load capacity so construction cost is low.
Traffic system:
- The main road of the industrial park is invested with 6 lanes, width 46 – 54m .
- The branch road of the industrial park is invested with 2-4 lanes, the road width is 26m .
Electricity distribution system :
- Industrial Park invests in building 110/22kV power supply station to supply industrial zones and residential areas. The station has a capacity of 63 MVA for the first time, 63+40MVA for the long term.
- Power source: From the National grid
- Electricity unit price 22kV (According to State regulations)
Water supply system:
- Currently, the IP can supply water with a capacity of 22,000m3/day to supply the industrial zone and residential area.
- Besides, Dat Do 1 Industrial Park has a low cost raw water supply system with a capacity of 100,000 m3/day.
Telecommunications Information:
- The IZ invests in building a complete communication system to serve the activities of enterprises in the IZ.
- Currently, Ba Ria – Vung Tau is considered as one of the provinces with the best telecommunications system in Vietnam.
Wastewater treatment system: Dat Do Industrial Park 1 invested in building a wastewater treatment station with a total capacity of 17,600m3/day. Currently, the wastewater treatment station has been completed – phase 1 with a capacity of 2,000m3/day.
Service and service works: Dat Do 1 Industrial Park has a planning of a service center area, which is used for banking services, customs, registration center… Besides, Dat Do 1 Industrial Park also provides provide the following support services to Secondary Investors:
- Apply for Investment Certificate.
- Apply for a Tax Identification Number.
- Register and apply for a seal sample.
- Consulting to prepare environmental impact assessment reports and periodic environmental monitoring reports.
- Advisory, Design, Building
- In addition, if required, investors will be supported with security and protection services, labor recruitment, import and export declaration procedures and freight, leveling, design and construction. construct…
The industrial park was built together with Dat Do 1 residential area with a scale of more than 99 hectares, providing residential and accommodation land for workers operating in the industrial park, and at the same time forming a closed industrial service area. , meeting well the living and entertainment needs of workers and experts in companies operating in industrial zones. In addition, Dat Do Industrial Park is built on an area with good geological conditions, contributing to reducing construction costs for projects operating in the IP.
3. Investment incentives
Exemption from corporate income tax for the first 2 years and a 50% reduction in payable tax for the next 4 years.
Support from the investor of the Industrial Park: Investors in Dat Do 1 industrial park will be supported with procedures for investment licensing and business establishment. At the same time, assisting the lessees in introducing construction units, affiliated banks, and preparing environmental impact assessment reports.
Interested investors please contact hotline 0967 41 31 86 or fill out the following form to receive more information: