Long An province is a key economic region in the South of Vietnam, this is considered an economic region with a very special role in the economic development strategy of our country, as a gateway to trade between Ho Chi Minh City and Ho Chi Minh City. Minh with 12 provinces in the Mekong Delta. Huu Thanh Industrial Park with a scale of 524.14 hectares with a total investment of VND 5,253 billion built in Huu Thanh commune, Duc Hoa district, Long An province promises to be an attractive investment location for investors. invest.
1. Geographical location
– Huu Thanh Industrial Park is located in the Southern Key Economic Zone, a dynamic economic region that plays a particularly important role in Vietnam’s economic development strategy.
+ The North: The North borders Tan Duc Industrial Park, Stage 2;
+ South: Adjacent to Century Industrial Park and Kenh Xang Nho;
+ The East: Adjacent to the Commune Canal.
+ West: Adjacent to the residential area for workers in Huu Thanh Industrial Park and about 150m from Provincial Road 830;
With a favorable geographical position adjacent to Ho Chi Minh City, it will benefit from the traffic – urban expansion projects from the city such as: National Highway N2 project has completed the construction of the Duc Hoa section – My An. Route N2 plays the role of a new axis of the Mekong Delta with the starting point in Cu Chi district (HCMC) going through the Dong Thap Muoi region; routes DT830 (ring 4), Metro 3A will be deployed in the near future. This will create more advantages for Huu Thanh Industrial Park in connecting trade with the center of Ho Chi Minh City and surrounding areas.
2. Hydro-climate characteristics
– Leveling height: 2.0m.
– Compression coefficient: 0.133 cm2/kg.
– Bonding force C: 0.297kg/cm2
– Natural weight: 1,758gcm3
– Compressive strength of soil: 0.7kg/cm2
– Angle of internal friction: 12o24‘
3. Land use planning
Huu Thanh Industrial Park has a total area of 524.14ha. In there:
– Industrial zone land: 395.41ha
– Land for management and service works: 5.02ha
– Land for technical infrastructure works: 5.37ha
– Green land and water surface: 64.16ha
– Land for traffic: 54.18ha