Overview
Phu My 3 Intensive Industrial Park is one of two model industrial park projects included in the Cooperation & Development Agreement signed between Vietnamese Prime Minister Nguyen Tan Dung and Japanese Prime Minister Yoshihiko Noda in November 2011.
Phu My 3 Intensive Industrial Park covers an area of 1,046 hectares, divided into 3 phases. With a strategic location 2 km from Cai Mep-Thi Vai Deep Sea Port, combined with synchronous, modern and international-standard infrastructure, Phu My 3 Intensive Industrial Park is an ideal destination. for investors.
Benefits of the Intensive Industrial Park:
- Extend the normal land lease period from 50 years to 70 years. For PM3, the license was issued in 2007, so in reality, the land lease term is about 57 years to 20 December 2077 and the land rent becomes cheaper.
- Land rent exemption for 20 years after the Industrial Park completes construction and comes into operation from 2018.
Attractive industry:
- Heavy industry: Petrochemical; Base material; Chemistry; Building materials; Metallurgical; Mechanical;…
- Multi-industry: Supporting industry; Textile, footwear; Consumer goods; Medical equipment; Medicine …
- Port and logistics services: Loading and unloading services and cargo tally; Container transshipment; Repair and maintenance; Warehouse; Enter the bonded warehouse; Transport …
- High technology: Information technology; Automation technology; Manufacture technology; Production technology …
List of lots
Utilities
1. Geographical location
Phu My 3 Intensive Industrial Park is located in a prime location, convenient traffic, near National Highway 51, Ben Luc – Long Thanh Expressway. Specifically:
- Distance from Long Thanh International Airport: 30km
- Distance from Tan Son Nhat International Airport: 60km
- Distance from international port system Cai Mep – Thi Vai: 2km
2. Infrastructure
- Cai Mep-Thi Vai international deep-water port system
With a depth of navigation channel from -14m ~ -16.5m, it is possible to receive ships up to 200,000 DWT to dock for cargo handling. Cai Mep – Thi Vai international deep-water port has full lines of ships going directly to Europe, America, and Inner Asia, helping to minimize the cost and time of freight, and optimize production.
- Power & Water Station
– POWER: Stable power source is supplied from Phu My Thermal Power Plant and Ba Ria Thermal Power Plant by Electricity of Vietnam (EVN), with a total capacity of 4,100 MW. The voltage of 22Kv is supplied to the customer’s fence in Phu My 3 Industrial Park by underground cable system.
– WATER: Water source is supplied to the customer fence in Phu My 3 specialized industrial zone with a capacity of 100,000 m3 / day and night by underground pipeline system D225-D600 by Phu My Water Supply Joint Stock Company (Wasuco). has a total capacity of 500,000 m3 / day and night from 2 sources of Da Den Lake (33.8 million m3) and Song Ray (208 million m3) from Chau Duc district.
- Water treatment factory
The centralized wastewater treatment plant of Phu My 3 Industrial Park, designed and built by Kobelco Eco-Solutions, is capable of treating wastewater up to the strictest and first column A standards in Ba Ria Vung Tau province. capacity: 45,000m3/day and night.
- Phu My 3 Inland Port (Phu My 3 ICD)
With an area of about 25ha, which includes 5 harbors. Phu My 3 inland port will be an extension arm for Cai Mep – Thi Vai deep-water port. Phu My 3 Inland Port provides services: transshipment, storage, warehousing, loading and unloading, customs clearance of goods, etc., contributing to shortening the time of goods release, minimizing logistics costs, and optimizing production for enterprises in Phu My 3 specialized industrial zone and surrounding areas.
- Gas Station
Condensate and liquefied petroleum gas (LPG) are supplied from Dinh Co gas processing plant to Thi Vai LPG terminal by underground pipelines passing through Phu My 3 Intensive Industrial Park next to the pipeline. Natural gas runs parallel to the boundary of Phu My 3 Industrial Park from Nam Con Son / Bach Ho gas pipeline system.
Natural gas (NG) & Liquefied petroleum gas (LPG) are managed and distributed to customers in Phu My 3 Industrial Park by Sojitz Osaka Gas Energy Co., Ltd. by 6-inch underground pipeline with capacity up to 15 million m3 of gas per month.
- Residential complex, villa / Golf course
With a total area of more than 100 hectares in phase 3 in Phu My 3 Industrial Park, the residential complex, villa/golf course will be a place to live combined with modern entertainment and full facilities for professionals and workers. domestically and internationally. In particular, the 18-hole golf course will be the first Japanese-style golf course in Vietnam, surrounded by beautiful natural scenery.
3. Investment incentives
CORPORATE INCOME TAX (CIT)
Enterprises in Phu My 3 Industrial Park are entitled to corporate income tax incentives as follows:
17% of taxable income for the first 10 years from the year of revenue according to Decree No. 118/2015/ND-CP & Decree No. 218/2013/ND-CP of the Government.
Tax exemption for the first 2 years from the year of taxable income, and 50% reduction for the next 4 years, after the new investment project has taxable income according to Decree No. 218/2013/ND-CP of Government.
IMPORT TAX
Exemption of tax on machinery and equipment for the petroleum – gas industry.
Tax exemption for goods and machinery used to create fixed assets for the implementation of investment projects.
Tax exemption for machinery and equipment that cannot be produced domestically.
LAND FOR LEASE
The lease period at Phu My 3 Industrial Park is 70 years (2007-2077), 20 years longer than the usual rental period in other IPs of 50 years.
Land lease fee is exempted for 20 years after Phu My 3 Industrial Park completes construction and comes into operation (from 2018) (exact time depends on the location of the land lot).
ONE-STOP SERVICE
Phu My 3 Intensive Industrial Park is a bridge between investors and local authorities, to assist investors in carrying out legal procedures at the stage of applying for an investment and construction permit and even after leaving. into production activities simply and quickly, helping customers in the Industrial Park feel secure to focus on production and business activities.